Register | Login | Set as Home Page | Bookmark | General Enquiries | Help | Tuesday, 14th of February 2012
Health & Safety Matters
 hsmsearch.com
Search 
Magazine 
Register for our ENewsletter
Click to visit http://www.toyota-forklifts.co.uk/EN/resources/Pages/default.aspx
Click to visit http://www.casellameasurement.com

Poll : February
Spend on health & safety in your organisation in 2012 will be?
This is an anonymous poll for statistical purposes only
Last Month's Poll

Are you in favour or proposals to reduce the number of workplace safety inspections?

Yes - 25%

No - 75%

Follow Health & Safety Matters on Twitter

Harvesting crane benefits
November 1st 2009

A specialist bale handling crane system has been installed by Demag Cranes & Components at Drax Power's new biomass processing facility at Goole, East Riding of Yorkshire. The plant processes straw into fuel pellets for co-firing with coal. Demag installed a 29m span, double girder, automatic crane system, rated at 22t SWL. Mounted on the crane is a specialist 12t bale handling grab unit.

Each day up to 400t of raw straw bales are unloaded from delivery lorries by the Demag crane, with operator control via a user friendly, remote controlled joystick. The system unloads 12 straw bales, with a total weight of 8t, per lift. Then, if moisture levels in the bales are acceptable, the crane switches to automatic mode and deposits them within the 1700m2 storage area to a positioning accuracy of 15mm.

More articles from Demag Cranes & Components Ltd: