| 
| | Poll : February | Spend on health & safety in your organisation in 2012 will be?
- Lower than in 2011
- Roughly the same as in 2011
- More than in 2011
| | This is an anonymous poll for statistical purposes only |
| Last Month's Poll
Are you in favour or proposals to reduce the number of workplace safety inspections?Yes - 25% No - 75%  |
|
|
Power provider October 1st 2009 South Bucks District Council and
neighbouring Chiltern District
Council have contracted standby
power company, Powercall UK, to
provide 'power within the hour' as
part of their emergency and business
continuity planning.
With the Powercall service, in the
event of a power failure a generator
is quickly despatched from a local
depot with a target time of less than
one hour and a guaranteed
commitment to a maximum of three
hours. The delivery engineer
connects the generator to the prefitted
connection point and advises
the customer to switch over to the
generator. An indicator lamp is fitted
to the changeover switch to advise
the customer when the mains power
is restored. More articles from Powercall UK: |